|
New User |
Joined: Mon Sep 11, 2006 10:26 am Posts: 5
|
I have some rooms in my house w/ solid 3/4 " strip (2.5") installed directly over 19/32 OSB. I would like to do an adjoining room with 3/4" solid 4" plank flooring stapled down. Would this leave me too subject to gaps between the wood?
Is it worth the additional trouble and expense to lay 1/4" luan with a 1/2" engineered product instead? Or should I just stick with teh 2 1/2" strip hoping this would hide more errors?
This would be my first DIY attempt. The subfloor incidentally has some high spots at seams I would need to sand.
Thank you.
|
|