|
Valued Contributor |
Joined: Wed May 14, 2008 11:31 pm Posts: 688 Location: Milford,Connecticut
|
Hi guys. Just looked at a job where the step down room is half cement slab and half plywood over sleepers. So far , we're leaning towards a glue down application and to match it to the rest of the flooring , it's best if I can sand and finish it on site .
Just wondering who has an engineered or good glue down floor with a thick wear layer . Also, if I recall, I think a company called Arizona flooring or Arizona lumber used to do an engineered floor that is thickness sanded at the factory.
Thanks
_________________ Paul @ Advanced Wood Floors Milford,Connecticut http://www.addwoodfloors.com
|
|