Amish made hardwood

It is currently Sun Nov 24, 2024 5:55 am

All times are UTC - 5 hours




Post new topic Reply to topic  [ 2 posts ] 
Author Message
 Post subject: What do do about my subfloor?
PostPosted: Wed May 24, 2006 9:41 pm 
Offline
New User

Joined: Wed May 24, 2006 4:18 pm
Posts: 1
I'm taking out 5/16 parquet and installing 3/4 x 3 1/4 hardwood strips w/ 2 in cleats. In taking out the parquet some of the subfloor is coming up too. With these gouges and the leftover adhesive, it makes for a pretty rough surface for laying new hardwood.

The subfloor is 1/2 in plywood over another 1/2 in ply. I can take it out and put in new, but that's a lot of work (especially after removing 330 sf of parquet!) I'm wondering if this is a situation where the self-leveling compounds might be of use.

I could also come back over the two half-inch plys with another 1/4, that that makes for some bigger transitions than I'd like. Likewise, leaving the parquet and going over the top of it doesn't seem too tenable.

Any suggestions? (I've already pulled up and replaced about 600 sf of particle board underlayment for two other carpeted rooms. My back wants a gentler solution. )


Top
 Profile  
 
Amish made hardwood

 Post subject:
PostPosted: Thu May 25, 2006 11:41 am 
Offline
Most Valuable Contributor

Joined: Sat Sep 25, 2004 7:42 pm
Posts: 4373
Location: Antioch, CA. 94509
You can either sand your subfloor smooth and patch it where needed. Or replace that top layer of 1/2". Floor prep is where many cut corners but it is the foundation of the job. If done poorly, nothing else will make up for it.


Top
 Profile  
 
Post new topic Reply to topic  [ 2 posts ] 

All times are UTC - 5 hours


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum

Search for:
Jump to:  
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group

phpBB SEO