Amish made hardwood

It is currently Mon Nov 18, 2024 3:54 am

All times are UTC - 5 hours




Post new topic Reply to topic  [ 6 posts ] 
Author Message
 Post subject: Using a buffer for floor prep
PostPosted: Tue Feb 22, 2005 11:00 pm 
Offline
Worthy Contributor

Joined: Fri Sep 17, 2004 11:52 am
Posts: 242
Location: Murphys, Calif.
Today I used a buffer equipped with one of those copper plates, to clean up the paint overspray, morter residue, etc, left on new construction My question, Do they wear out? It was on the shops machine, so I have no idea how old it is, and the last time someone used it, they used a 20 grit disc over it. I thought it would cut faster. I sure like the idea of not hand scraping while prepping concrete floors.

I also rented a big Eddco surface grinder to attempt to take care of some high spots. Came with stones on it, and wasn't as aggressive as the rental guy led me to belive. Would a scarify(er) have been the better choice? I had an area about two feet wide, about 6 feet long, that was 3/8 too high. Gave up on the surface grinder, and used self leveler. Grinding still would have been better; what should I have used? Or how should I have gone about it?


Top
 Profile  
 
Amish made hardwood

 Post subject:
PostPosted: Wed Feb 23, 2005 6:51 pm 
Offline
Valued Contributor

Joined: Fri Aug 06, 2004 6:19 am
Posts: 703
I just use a hardplate and some tuff paper.


Top
 Profile  
 
 Post subject:
PostPosted: Thu Feb 24, 2005 12:36 am 
Offline
Worthy Contributor

Joined: Fri Sep 17, 2004 11:52 am
Posts: 242
Location: Murphys, Calif.
And tuff paper would be..... 20 grit? Yeah, I'm a dope!


Top
 Profile  
 
 Post subject:
PostPosted: Thu Feb 24, 2005 12:37 am 
Offline
Most Valuable Contributor

Joined: Sat Sep 25, 2004 7:42 pm
Posts: 4373
Location: Antioch, CA. 94509
I've tried to knock down high spots on concrete with real coarse sandpaper (16 grit) What a waste of time! I've heard grinders are the way to go. But the dust! Ugh! :x I avoid slap prep that requires that much detailing. I'll just sub it out and do what I do best, lay floors. Did you consider dynamite? :lol:


Top
 Profile  
 
 Post subject:
PostPosted: Thu Feb 24, 2005 12:43 am 
Offline
Worthy Contributor

Joined: Fri Sep 17, 2004 11:52 am
Posts: 242
Location: Murphys, Calif.
the problem being that, when installing for a shop, I don't see the job beforehand, then I find what the salepeople don't want to see, and if I pull off, I can lose at least the rest of that day; or maybe the rest of the week.


Top
 Profile  
 
 Post subject:
PostPosted: Thu Feb 24, 2005 1:13 am 
Offline
Most Valuable Contributor

Joined: Sat Sep 25, 2004 7:42 pm
Posts: 4373
Location: Antioch, CA. 94509
Yeh, I understand! Ya gotta do what ya gotta do! Do they pay you decent to deal with that? I'll bet they try to talk you out of doing that much prep, saying it isn't that bad. I know when I've subbed for shops they always tried to cheap out on the prep and tried to get me me to cut corners or eat the prep. I got so fed up with that BS that I stopped subbing except for a select few who know where I stand. Now, I don't get many calls for subbing but I'm not doing any prep for free either.


Top
 Profile  
 
Post new topic Reply to topic  [ 6 posts ] 

All times are UTC - 5 hours


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum

Search for:
Jump to:  
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group

phpBB SEO