|
Site Admin |
|
Joined: Wed Aug 04, 2004 10:08 pm Posts: 1732 Location: Bonita Springs, Florida
|
Good catch bm
Most people wouldn't think twice about it and there are more than just a few failed jobs due to high moisture content in plywood.
OSB and plywood will have different readings depending on moisture meters used. El cheapo's won't give an accurate reading. Not sure? Wait it out. Acclimate it. I couldn't even guess how long.
1/2" + 1/2" probably equals 7/8" the way plywood is graded.
Good enough if the floor joists aren't that far apart.
_________________ See the room scene gallery at Uptown Floors.
Uptown was created by your administrator, offering my high quality 3/4" engineered floors made in the USA. Unfinished and prefinished.
|
|