we're doing a home renovation at the moment and tore out all flooring on the first and second floor, about 2900 sq ft... and we're having 5" wide unfinished hickory (3/4") installed.
the installers are using liquid nails subfloor and deck glue under the boards as well as nailing them.
they're about 80% done with laying it.
https://www.liquidnails.com/products/su ... adhesive-1is this the WRONG glue to be doing this job with? should they be using something else?
i'm starting to have a major panic attack after reading a little bit about this.
please calm my nerves and tell me this will be ok...