|
New User |
Joined: Thu Jun 30, 2005 9:59 pm Posts: 1 Location: Oregon
|
I'm preparing to install a Maple floor in our sunken living room. Upon removing the carpet and starting to remove the mouldings I discovered that the step down into the room had been added after the mouldings were installed and finished. I have removed the stair but am wondering if it would be better to build a new step and install before laying the hardwood, or install the floor and finish, replace the moulding and then install the step? Any suggestions out there?
|
|