OK, I am doing 3/4" solid IPE over concrete, with one of the suggested methods (6 mil plastic, 3/4" CDX ply, 15 lb felt paper). However, I did have to flatten the slab first, and to my surprise, I have used 400 lbs of concrete patch material, and I expect I will use another 120 lbs before I am done. Some of the areas required 1/2" or slightly more! Needles to say, it's been a lot of work for a first-timer. My concern now is that there may be a lot of water in that extra concrete. I have never heard of anyone waiting x many days before proceding (except newly poured slabs), so I wanted to check with experts here. Should I wait just a couple of days? A week? Thanks!
|