|
Prized Contributor |
Joined: Sat May 02, 2009 3:45 pm Posts: 3357 Location: Tucson AZ
|
Usually if the base is long enough, like 16' footers some of it will rest on the floor as you fasten it. Or you can measure the distance and mark it if your so inclined. I never have that problem because I would rather undercut the drywall if I need extra expansion space than use shoe or quarter round.
_________________ Stephen Perrera Top Floor Installation Co. Tucson, Arizona IFCII Certified Inspector Floor Repairs and Installation in Tucson, Az http://www.tucsonazflooring.com
|
|