In the middle of a large great room where I am installing a nail down hardwood floor, there is a raised hearth fireplace situated on the outside wall. The sub floor has a pretty good sized low spot across the width of the front of the hearth. It starts from about the middle of the room, where a beam is located in the basement, and slopes towards the hearth. The low spot is due to a framing issue that would have taken a great deal of reconstruction to correct.
I have been able to minimize the low spot using shingles to shim it, with 3 thick at the lowest point. The hearth is undercut enough to accept the flooring with the shimming and tuck nicely just under the brick. Here is my problem, since the hearth is raised, I won't be able to use a flooring nailer the last few rows. I do have a palm nailer that accepts cleats that will get me closer but I will still have a couple of rows, maybe three, that I won't be able to nail unless from the top. Normally, I would glue the last couple of rows but with shingle shimming that won't work. I would prefer not to top nail for cosmetic reasons mostly but also because of the shimming shingles underneath, especially with finish nails. I was thinking it might be acceptable to use a layer of 5/16' plywood, instead of the shingles, under the last couple of rows and then glue to that?
Would I glue and screw the plywood? What type of glue would be best, subfloor, carpenters glue, or poly construction adhesive?. I use Loctite PL for gluing the last couple of rows.
Thanks for any insight offered.
|