Here they are doing them over concrete for: Floor prep is never part of the bid... never! But there is a butt load of prep. Moisture barrier and asphalt felt. Double layers of ¾ Subfloor with rubber cleats installed .75¢ a ft. Labor Nail down 1¼ or 2¼ Maple $1.10 sq.ft. Labor Sand .90¢ sq.ft. Labor and paper Lay down and paint lines can vary, but it comes out to about $500, without anything custom. Labor Apply Gym Floor Finish .45¢ sq.ft. Labor
So, about $3.10-$3.50 sq.ft. without painting the lines. Floating Subfloor Install wood Sand, paint lines and finish
They throw about 15-20 tourist in there from south of the border and knock it out.
_________________ When you want it done WRIGHT www.AustinFloorguy.com
|