I have a floor that the cliant would like to have refinished, but it looks like it may have been installed too wet. On one level the floor was installed directly over a wood stove that is in the room below, so the floor gets baked in the winter with mostly wood being burnt for heat. On a lower level the floor was installed over a insulated but unheated room. Since I am only looking at sanding and finishing I am looking for a viable solution to the gaping up to 1/4" in some places. my thought was put a kerf down the boards, and then put sika flex or some other flexible caulking in the kerf/gaps. any thoughts? btw this in in western washington state so their is humidity