I'm sure this topic has been addressed many times but I did not find anything using the search feature, so I will ask again.
I purchased Shaw engineered hardwood from a local Pro Source dealer. I have read the installation manual found on the Shaw installation guide and even called Shaw but I still have a few questions.
Product: White Oak 9/16" 7.5" wide engineered Substrate: 3/4" new plywood subfloor on ground floor with crawlspace and on second floor. California coastal region--no extreme temperature swings. No vapor barrier due to glue assist.
Questions: Given the width, this will be a nail with glue assist. Is it recommended to use a trowel on adhesive or a "sausage" application from a glue/caulk gun? I would prefer to use the glue gun type if it is approved. Any particular type or brand recommendations?
What gauge 1.5" minimum fastener is preferred for 9/16"? Are staples or cleats preferred? I have used both 16g and 18g on other installations with similar products. The Shaw installation guide specifies 1.5" minimum staple/cleat but does not specify gauge. I have installed similar products with 18g staples with good results. I would be wary of using larger 15.5g fasteners on a 9/16" plywood base.
Thank you,
Jeff
|