Amish made hardwood

It is currently Sat Nov 23, 2024 11:35 am

All times are UTC - 5 hours




Post new topic Reply to topic  [ 6 posts ] 
Author Message
 Post subject: Engineered HW flooring over old Schluter membrane
PostPosted: Mon Jul 22, 2019 6:09 am 
Offline
New User

Joined: Mon Jul 22, 2019 5:31 am
Posts: 3
Hello experts, this is my 1st post here. The issue I am interested in is how to address this situation. It is a condo that appears to have gypcrete floors. There was carpet on some of the flooring and ceramic tile over the rest. Under the carpet, looks fine. When the tile was pulled, there was Schluter membrane over the gypcrete. How would someone prep this surface to be able to glue down new engineered HW flooring over all of the condo floor space? See attached pic. In the foreground is where the carpet used to be. The mess in the middle is where the tile was and then in the background it is smooth again where more carpet was. The entire area is going to be HW floors now. I was just curious as to if any one you have dealt with this and how it is handled? I hope you can view this pic. I was not able to insert it as an image for some reason.
Thanks, James

https://ibb.co/2NFgf1F


Top
 Profile E-mail  
 
Amish made hardwood

 Post subject: Re: Engineered HW flooring over old Schluter membrane
PostPosted: Mon Jul 22, 2019 6:19 am 
Offline
Worthy Contributor

Joined: Tue Nov 28, 2017 8:02 am
Posts: 146
So you need to get a hold of a concrete finishing/levelling contractor and they will grind down the rough patch and then apply a self levelling skim coat to bring everything flat again. You need a very flat subfloor for a successful glue down hardwood installation (1/8th over 10ft). Be sure to tell they you are looking for that tolerance specifically. Might cost 1$-1.50$ per SQFT depending on where you are.


Top
 Profile E-mail  
 
 Post subject: Re: Engineered HW flooring over old Schluter membrane
PostPosted: Mon Jul 22, 2019 6:25 am 
Offline
New User

Joined: Mon Jul 22, 2019 5:31 am
Posts: 3
WestonKris, thanks for the reply! Now at least I know it is possible.
So if that process is done, how long does the skimcoat have to cure before HW can be glued down?
--James


Top
 Profile E-mail  
 
 Post subject: Re: Engineered HW flooring over old Schluter membrane
PostPosted: Mon Jul 22, 2019 9:23 am 
Offline
Worthy Contributor

Joined: Tue Nov 28, 2017 8:02 am
Posts: 146
Not long - 12-24 hours would be my recommendation.


Top
 Profile E-mail  
 
 Post subject: Re: Engineered HW flooring over old Schluter membrane
PostPosted: Mon Jul 22, 2019 10:25 am 
Offline
New User

Joined: Mon Jul 22, 2019 5:31 am
Posts: 3
Oh thank goodness. I was hoping you were not going to say 1-2 weeks.


Top
 Profile E-mail  
 
 Post subject: Re: Engineered HW flooring over old Schluter membrane
PostPosted: Mon Jul 22, 2019 10:07 pm 
Offline
Prized Contributor

Joined: Tue Jun 16, 2015 12:02 am
Posts: 1754
You could float a floor over the rough area. Build up the adjacent area so everything is flat, first.


Top
 Profile E-mail  
 
Post new topic Reply to topic  [ 6 posts ] 

All times are UTC - 5 hours


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum

Search for:
Jump to:  
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group

phpBB SEO