Amish made hardwood

It is currently Sun Nov 24, 2024 9:44 am

All times are UTC - 5 hours




Post new topic Reply to topic  [ 31 posts ]  Go to page Previous  1, 2, 3
Author Message
 Post subject:
PostPosted: Wed Aug 30, 2006 8:24 pm 
Offline
Newbie Contributor

Joined: Sat Aug 26, 2006 2:24 pm
Posts: 31
8 more man hours, plastic down, new 3/4 CDX screwed in place.

Walls are getting plaster, so baseboard needs to go in first, prior to floor (which will go in last!!!). Base is 3 1/2" and Ima thinking of setting a 1x2 at 3 3/4 above rough floor to act as a plaster stop. After plaster dries I can set the floor, then doctor base into 3 3/8+/-, leaving a little room on top for caulk. I think this is the best solution for a snug fit, floor to base.

?


Top
 Profile  
 

Post new topic Reply to topic  [ 31 posts ]  Go to page Previous  1, 2, 3

All times are UTC - 5 hours


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum

Search for:
Jump to:  
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group

phpBB SEO