Amish made hardwood

It is currently Sat Nov 23, 2024 1:36 pm

All times are UTC - 5 hours




Post new topic Reply to topic  [ 17 posts ]  Go to page Previous  1, 2
Author Message
 Post subject:
PostPosted: Sat Dec 04, 2004 2:22 am 
Offline
Most Valuable Contributor

Joined: Sat Sep 25, 2004 7:42 pm
Posts: 4373
Location: Antioch, CA. 94509
cmose,
As I understand it, you have a 3/8" b. cherry you want to nail/staple down to a plywood substrate installed over a concrete slab that has not been tested for mc. It's simple:
1) use Taylor's Lockdown moisture barrier and their Meta -Tec addhesive for wood,2071. http://www.wftaylor.com/pdf_manual/lockdown5.pdf
2) cut your plywood (I'd use 5/8" or 3/4" for staple down) into 16" by 8' strips or 2 by 8 and glue them down to your slab running 90 deg. to your flooring direction. Be sure to kerf the backside 1/2 the depth of the plywood (5/16" for 5/8", 3/8" for 3/4"). Space them 1/4" apart or so. No need to be super clean. You'll have a strong, well bonded subfloor ready to nail that 3/8 to that has a moisture warranty. Keep it simple!


Top
 Profile  
 

 Post subject:
PostPosted: Mon Dec 06, 2004 9:38 am 
Offline
Newbie Contributor

Joined: Tue Nov 02, 2004 10:04 am
Posts: 17
Thanks!!


Top
 Profile  
 
Post new topic Reply to topic  [ 17 posts ]  Go to page Previous  1, 2

All times are UTC - 5 hours


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum

Search for:
Jump to:  
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group

phpBB SEO